top of page

FREYA SWEATER
Adding the ring detail
A ring is always first placed in Row 3 (for Cable 2) or Row 9 (for Cable 1).

Work until you reach row 3 | row 9 of the Cable Chart.

K4 of the cable, ...

... sl the last 2 sts back on the left hand needle and place the ring around these 2 sts to secure it.

Sl the 2 sts back on the right hand needle, the ring is now hanging around those 2 sts.

Continue to until you reach row 7 | row 1, leaving the ring hanging.

K the first 2 sts of the cable, fold the ring up ...

... and k the next 2 sts through the ring to secure it.

Continue in cable st pattern.
bottom of page